Most of what can go wrong with a landed house sits on the land rather than in the house: a future road line, a drainage reserve, a storey limit, conservation rules, protected trees, or a buyer who is not allowed to own it. You can check most of it yourself. Several checks are free from the address, and the paid plans can be ordered online by any buyer before taking the option.
The option period is short, so the order matters. If a plan shows a problem before you take the option, you can walk away without losing the option fee.
This list covers the checks that come up on most landed purchases. It is not complete. An older house, a sloping plot, a shared boundary wall or an unusual title can need more, and your surveyor, architect or conveyancing lawyer may ask for others.
The checklist at a glance
| Check | Why it matters | Where to get it | Cost |
|---|---|---|---|
| Who may buy | A foreign person, including a permanent resident, needs approval to own a landed house | SLA's website | Free to read |
| Storey limit | Sets how big a rebuild can be | URA SPACE map | Free |
| Good Class Bungalow Area, conservation | Extra planning rules on what can be built | URA SPACE map | Free |
| Protected trees | Cutting a large tree may need NParks' approval | NParks TreesSG map | Free |
| Flood-prone roads | The street has flooded before | PUB's published list | Free |
| Recorded prices | What houses on the street sold for | URA's transaction search | Free |
| Road line plan | Land set aside for a future road | INLIS, run by SLA | Paid |
| Railway protection plan | Building works near a rail line go through LTA | INLIS | Paid |
| Drainage interpretation plan | Land set aside for drains | PUB | Paid |
| Title search | Tenure, and who else has rights over the land | INLIS | Paid |
| URA legal requisition | The latest planning decision and zoning | URA e-service | Paid |
| Approved plans | What was approved to be built | The seller, or URA with the owner's consent | Paid at URA |
| Agency requisitions | Building orders and sums owed to agencies | Your lawyer, after the option | Paid |
| The house itself | Unauthorised works, roof, structure, termites | An inspector, at the viewing | Paid |
Who may buy a landed house
Why it matters. A buyer who needs approval and does not have it cannot complete the purchase. Approval takes weeks, so settle it before the option.
Landed houses are restricted under the Residential Property Act. SLA defines a foreign person as anyone who is not a Singapore citizen, a Singapore company, a Singapore limited liability partnership or a Singapore society. A Singapore permanent resident is therefore a foreign person for this purpose.
SLA lists the types a foreign person "must seek approval to purchase", including "Terrace house", "Semi-detached house", "Bungalow/detached house" and "Strata landed house which is not within an approved condominium development under the Planning Act (eg. townhouse or cluster house)". A "Strata landed house in an approved condominium development" needs no approval.
Approval is decided "on a case-by-case basis". SLA names two factors: "You should be a permanent resident of Singapore for at least five years" and "You must make exceptional economic contribution to Singapore." SLA says an assessment "generally takes about 30 working days" once it has every document.
How to check. Read SLA's foreign ownership page, which lists every property type and the approval criteria.
Stamp duty and loan limits follow the same rules as for a condo. The selling-first or buying-first article sets them out, and notes they are the same when the next home is a landed house.
Free checks from the address
These come from URA, NParks and PUB. Each agency marks its map layers as indicative, so use them to decide what to look into, and confirm with the paid plans below.
Storey limit
Why it matters. On an older house, the storey limit decides how big a house you can rebuild on the plot. URA: "The maximum building height is 12m for a 2-storey landed housing area and 15.5m for a 3-storey landed housing area."
How to check. URA says to "refer to the 'Landed Housing Area' layer under the 'Control Plans' section of URA SPACE." It is URA's free online map. Search the address and turn on that layer.
Good Class Bungalow Areas and conservation
Why it matters. A house in a Good Class Bungalow Area or a conservation area comes with extra planning rules on what can be built and changed.
How to check. Both are layers on URA SPACE. If the lot falls in either, read URA's guidelines for that area before you plan any work.
Protected trees
Why it matters. In a tree conservation area, NParks says owners must seek "written approval from the Commissioner of Parks & Recreation" to cut "any tree with a girth of more than 1 metre", whether or not building works are under way. A large tree on the plot can shape where a rebuild can go.
How to check. NParks says to use TreesSG, its free tree map, and choose "Search/Plot a Tree" with the "Tree Conservation Areas" layer. The same map shows heritage trees.
Flood-prone roads
Why it matters. On low-lying land, PUB sets a minimum platform level, and URA measures a rebuild's height limit from the higher of that level and the allowable platform. PUB lists the roads and areas it treats as flood-prone.
How to check. PUB publishes a list of flood-prone roads and areas as a PDF. It names roads, not lots, so it tells you whether the street is on the list.
Recorded prices on the street
Why it matters. Recorded sales on the same street show whether the asking price is in line.
How to check. URA's private residential transactions search is free and covers landed houses. It lists sales by street, not house number, and only sales with a caveat lodged, so some deals do not appear.
Paid plans any buyer can order before the option
You can order all of these yourself. Most come through INLIS, SLA's online land information service, paid by card.
Road line plan
Why it matters. LTA "safeguards land for road reserve to construct new roads or improve existing roads." If a road reserve line cuts the lot and you rebuild, "Any building protrusions into the road reserve will have to be removed upon development/redevelopment of the land". If you do not rebuild, "The government will acquire the land when it constructs or improves a road." LTA "does not disclose to members of the public when a particular road would be constructed or improved."
How to check. LTA: "You can purchase a Road Line Plan from LTA via the Integrated Land Information Services (INLIS) website managed by the SLA". The road reserve "is shown in red". If no line cuts the lot, the plan says "There are no road safeguarding lines on the selected lot(s)." It "does not specify a validity period", so order it close to the date you decide.
Railway protection plan
Why it matters. Development and building proposals within the railway protection zone go through LTA's lodgement scheme, checked by a qualified person. That affects how and when you can rebuild near a rail line.
How to check. LTA: "The Railway Protection Plan (RPP) showing the railway protection lines can be obtained via INLIS".
Drainage interpretation plan
Why it matters. It shows where public drains and drainage reserves sit against the lot, so you know whether part of the land is set aside for drainage.
How to check. Apply to PUB. URA's legal requisition does not cover this: "For information on drainage proposals, please apply for a Drainage Interpretation Plan from the Public Utilities Board (PUB)".
Title search
Why it matters. The title shows the tenure, and the caveats, easements and mortgages lodged against the lot: who else has rights over the land. A lease's start date and length come from here, not from the listing.
How to check. SLA: "You may search via our Integrated Land Information Service" (INLIS). You need the lot number and survey district, the title number, or the address.
URA legal requisition
Why it matters. It gives "information on the latest planning decision" for the lot and its current Master Plan zoning. It does not cover roads or drains, which is why the road line plan and drainage plan are ordered separately.
How to check. "Any member of the public may apply for a Legal Requisition", online through URA. URA says replies "are generally issued within three (3) working days" after payment.
Approved plans
Why it matters. URA advises buyers to "ensure that it does not have any unauthorised works and extensions or is currently not used inappropriately", because the new owner can become responsible for them. The approved plans are what you compare the house against.
How to check. Ask the seller for a copy. URA also sells planning records, but its application asks for "Documentary proof of ownership of property" or a "Letter of authorisation from the property owner", so as a buyer you need the seller's consent.
After the option: agency requisitions
Why it matters. Building orders from BCA, the house's completion status and sums owed to BCA, IRAS and other agencies stay with the property.
How to check. These go only to the owner's authorised lawyer, through the InteReq system, after the option is exercised. Ask which ones will be requested, so you know what is still open.
The house itself
Why it matters. A viewing will not show a roof that leaks after rain, termite damage, a damp basement or a retaining wall that is moving.
How to check. A professional building inspector, at or before the second viewing. On an older house, a structural engineer can say which walls carry load before you plan a renovation.
Common questions
Can a Singapore PR buy a landed house?
Only with approval. Under the Residential Property Act a permanent resident is a foreign person, and SLA lists terrace, semi-detached and detached houses among the types that need approval. Its criteria include being "a permanent resident of Singapore for at least five years". A strata landed house inside an approved condominium development needs no approval.
Can I check for a future road before I make an offer?
Yes. Anyone can buy LTA's road line plan for the lot through SLA's INLIS website. The road reserve shows in red. If no line cuts the lot, the plan says "There are no road safeguarding lines on the selected lot(s)."
Does a road reserve mean the government will take my land?
Not straight away. LTA says an owner who does not rebuild "need not take any immediate action", and the land is acquired when the road is built or improved. An owner who rebuilds must keep the new house out of the reserve, though LTA lets the affected land count towards the plot ratio.
Is this every check I need?
No. It covers the checks that come up on most landed purchases. A particular house can need more: a boundary survey where a wall is shared, a soil report on a slope, or searches on an unusual title. The people working on the purchase may ask for others.
Before you make an offer
If you would rather not run these yourself, send me the address. I pull the free checks for the lot, tell you which paid plans to order, and we go through what comes back before you take the option.
